Camera Install in Building 3 - Saw Dept
We need 2 cameras installed on opposite sides of each other to cover cutting section below.

Camera #1 - Wire run is about 60ft
Camera #2 - Wire run is about 175ft

Camera install Building 3 - Grinding Area

We will need 5 cameras installed in this area. I have also provide a map layout below as well.This run will be about 160 as well and can have wires run nakes inside.

Grinding Area

Rancho Vending Machine

Run 2 lines of Cat 6 Plenium from
Point #1 on the south side of the wall to Point #2 IDF
The run is about 185ft long between both locations

Fontana Security Camera Install
7 Cameras installed on Building 3
4 Cameras installed on Shipping Building